David Sylva

44%
-5.1 vs 49% median
17
Construction Permits
18 total
10
Currently Open
16
Rate-Eligible
permits > 1yr old
2017–2025
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Plumbing10 rated

40.0% closed vs 63% median, 23.0 points lower

Gas4 rated

50.0% closed vs 59% median, 8.6 points lower

Building2 rated

50.0% closed vs 30% median, 20.1 points higher

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2025

Open1
Closed0

Too early to rate — permits need 1 year to mature

2024

0.0%
Open3
Closed0

0 closed / 3 rated

2023

28.6%
Open5
Closed2

2 closed / 7 rated

2018

100.0%
Open0
Closed3

3 closed / 3 rated

2017

66.7%
Open1
Closed2

2 closed / 3 rated

All Permits

18 permits
StatusPermit #AddressIssued
OpenPL1799968, BostonNov 26, 2025<1yr
OpenPL1626109427 Marlborough ST, BostonAug 19, 2024
OpenG158941836 Mystic ST, CharlestownApr 22, 2024
OpenPL158941936 Mystic ST, CharlestownApr 17, 2024
OpenPL1489914427 Marlborough ST, BostonJun 27, 2023
OpenSF1465154427 Marlborough ST, BostonJun 1, 2023
OpenPL1441676, BostonFeb 22, 2023
ClosedPL1442449109 Parsons ST, BrightonFeb 17, 2023
OpenG1441670, BostonFeb 15, 2023
OpenPL1436785427 Marlborough ST, BostonFeb 7, 2023
ClosedSF1435937, BostonJan 31, 2023
ClosedPL81769914 Rockwood TE, Jamaica PlainApr 23, 2018
ClosedG74853863-65 Burbank ST, BostonMar 7, 2018
ClosedPL74853763-65 Burbank ST, BostonFeb 6, 2018
OpenSF772740300 Allston ST, BrightonNov 14, 2017
ClosedG773521162-172 Columbus AV, BostonNov 2, 2017
ClosedPL772473162-172 Columbus AV, BostonNov 1, 2017
OpenPL772741300 Allston ST, BrightonNov 1, 2017

See Other Applicants