Edward Toran
33%
4
Construction Permits
5 total
3
Currently Open
3
Rate-Eligible
permits > 1yr old
2018–2025
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Building3 rated
33.3% closed vs 30% median, 3.3 points higher
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2025
—
Open1
Closed0
Too early to rate — permits need 1 year to mature
2024
0.0%
Open1
Closed0
0 closed / 1 rated
2023
100.0%
Open0
Closed1
1 closed / 1 rated
2018
0.0%
Open1
Closed0
0 closed / 1 rated
All Permits
5 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ALT1682470 | Long Form/Alteration Permit | 12 Lime ST, Boston | Mar 26, 2025<1yr | Sep 26, 2025 | $837,000 |
| Open | SF1669776 | Short Form Bldg Permit | 12 Lime ST, Boston | Nov 14, 2024 | May 14, 2025 | $15,000 |
| Closed | SF1529060 | Short Form Bldg Permit | 49 Beacon ST, Boston | Oct 2, 2023 | Apr 2, 2024 | $52,000 |
| Open | SF1010081 | Short Form Bldg Permit | 25 Phillips ST, Boston | Jan 6, 2020 | Jul 6, 2020 | $78,000 |
| Open | ALT883350 | Long Form/Alteration Permit | 25 Phillips ST, Boston | Nov 27, 2018 | — | $103,995 |