james oleary

13%
-36.8 vs 49% median
8
Construction Permits
9 total
7
Currently Open
8
Rate-Eligible
permits > 1yr old
2010–2022
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Building8 rated

12.5% closed vs 30% median, 17.5 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2022

100.0%
Open0
Closed1

1 closed / 1 rated

2011

0.0%
Open6
Closed0

0 closed / 6 rated

2010

0.0%
Open1
Closed0

0 closed / 1 rated

All Permits

9 permits
StatusPermit #AddressIssued
ClosedCOO139044240 Clifford ST, Hyde ParkSep 9, 2022
ClosedERT115126640 Clifford ST, Hyde ParkJan 14, 2022
OpenSF99179362-366 Commonwealth AV, BostonOct 31, 2011
OpenALT6769184-100 Peterborough ST, BostonSep 15, 2011
OpenALT6771284-100 Peterborough ST, BostonSep 15, 2011
OpenALT8455584-100 Peterborough ST, BostonAug 12, 2011
OpenSF6729884-100 Peterborough ST, BostonMar 11, 2011
OpenSF5845984-100 Peterborough ST, BostonJan 10, 2011
OpenSF49801545-547 E Eighth ST, South BostonNov 2, 2010

See Other Applicants