JOHN CONNELL

17%
-32.2 vs 49% median
6
Construction Permits
10 total
5
Currently Open
6
Rate-Eligible
permits > 1yr old
2016–2021
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Electrical6 rated

16.7% closed vs 60% median, 42.8 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2021

0.0%
Open3
Closed0

0 closed / 3 rated

2019

0.0%
Open1
Closed0

0 closed / 1 rated

2018

0.0%
Open1
Closed0

0 closed / 1 rated

2016

100.0%
Open0
Closed1

1 closed / 1 rated

All Permits

10 permits
StatusPermit #AddressIssued
OpenE1264639197 Foster ST, BrightonNov 3, 2021
OpenE12646362599-2601 Beacon ST, BrightonNov 3, 2021
OpenE12596922599-2601 Beacon ST, BrightonOct 22, 2021
OpenE12596932599-2601 Beacon ST, BrightonOct 22, 2021
OpenE1132684197 Foster ST, BrightonNov 2, 2020
OpenE10186762599-2601 Beacon ST, BrightonOct 31, 2019
OpenE1017229197 Foster ST, BrightonOct 29, 2019
OpenE8958472599-2601 Beacon ST, BrightonNov 2, 2018
OpenE895853197 Foster ST, BrightonNov 2, 2018
ClosedE6565752599-2601 Beacon ST, BrightonNov 16, 2016

See Other Applicants