Matthew Dennen
50%
4
Construction Permits
1
Currently Open
2
Rate-Eligible
permits > 1yr old
2016–2025
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Electrical2 rated
50.0% closed vs 60% median, 9.5 points lower
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2025
—
Open0
Closed2
Too early to rate — permits need 1 year to mature
2017
100.0%
Open0
Closed1
1 closed / 1 rated
2016
0.0%
Open1
Closed0
0 closed / 1 rated
All Permits
4 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Closed | E1807178 | Electrical Permit | 100 Huntington AV, Boston | Dec 19, 2025<1yr | Jun 19, 2026 | $0 |
| Closed | E1807178 | Electrical Permit | 100 Huntington AV, Boston | Dec 19, 2025<1yr | Jun 19, 2026 | $0 |
| Closed | E694599 | Electrical Permit | 130 Appleton ST, Boston | Apr 3, 2017 | Oct 3, 2017 | $3,000 |
| Open | E616292 | Electrical Permit | 248-270 Cambridge ST, Boston | Aug 10, 2016 | Feb 10, 2017 | $55,000 |