Ryan Doak

33%
-15.6 vs 49% median
12
Construction Permits
10
Currently Open
6
Rate-Eligible
permits > 1yr old
2024–2025
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Electrical3 rated

33.3% closed vs 60% median, 26.2 points lower

0.0% closed vs 28% median, 28.2 points lower

Fire Alarm1 rated

100.0% closed vs 39% median, 61.5 points higher

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2025

0.0%
Open8
Closed0

0 closed / 2 rated

2024

50.0%
Open2
Closed2

2 closed / 4 rated

All Permits

12 permits
StatusPermit #AddressIssued
OpenELV18033441 Fenway PZ, BostonDec 11, 2025<1yr
OpenELV18033441 Fenway PZ, BostonDec 11, 2025<1yr
OpenELV177677444 Binney ST, BostonOct 7, 2025<1yr
OpenELV1776778440 Brookline AV, BostonOct 7, 2025<1yr
OpenELV17142294 Blackfan CI, BostonMay 8, 2025<1yr
OpenELV17142294 Blackfan CI, BostonMay 8, 2025<1yr
OpenELV16884291 Fenway PZ, BostonFeb 5, 2025
OpenELV16884291 Fenway PZ, BostonFeb 5, 2025
OpenE165788350 Staniford ST, BostonOct 9, 2024
OpenE165788350 Staniford ST, BostonOct 9, 2024
ClosedEFA160552451 Sleeper ST, BostonJul 15, 2024
ClosedE160551751 Sleeper ST, BostonJun 13, 2024

See Other Applicants