Scott Bilodeau

29%
-20.3 vs 49% median
21
Construction Permits
22 total
15
Currently Open
21
Rate-Eligible
permits > 1yr old
2022–2025
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Gas8 rated

12.5% closed vs 59% median, 46.1 points lower

Electrical7 rated

42.9% closed vs 60% median, 16.6 points lower

Plumbing6 rated

33.3% closed vs 63% median, 29.7 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2025

0.0%
Open2
Closed0

0 closed / 2 rated

2024

38.5%
Open8
Closed5

5 closed / 13 rated

2023

0.0%
Open4
Closed0

0 closed / 4 rated

2022

50.0%
Open1
Closed1

1 closed / 2 rated

All Permits

22 permits
StatusPermit #AddressIssued
OpenE1683100155-163 Border ST, East BostonJan 14, 2025
OpenG1683096155-163 Border ST, East BostonJan 13, 2025
ClosedPL16772901255-1261 Boylston ST, BostonDec 10, 2024
OpenE167452310 Converse ST, BrightonDec 3, 2024
ClosedG167449210 Converse ST, BrightonDec 3, 2024
OpenPL1669174301-315 Massachusetts AV, BostonNov 6, 2024
OpenPL1637643301-315 Massachusetts AV, BostonAug 14, 2024
OpenE1628397556 E Sixth ST, South BostonAug 13, 2024
OpenSF1621159556 E Sixth ST, South BostonJul 23, 2024
ClosedE1617550152 Leyden ST, East BostonJul 9, 2024
ClosedE1621129556 E Sixth ST, South BostonJul 1, 2024
ClosedE1601983556 E Sixth ST, South BostonMay 21, 2024
OpenG1568668137 Geneva AV, DorchesterFeb 9, 2024
OpenG155957980 L ST, South BostonJan 8, 2024
OpenPL155958280 L ST, South BostonJan 8, 2024
OpenG1556476790 Hyde Park AV, Hyde ParkJan 4, 2024
OpenE1528830152 Leyden ST, East BostonDec 29, 2023
OpenPL155525180 L ST, South BostonDec 29, 2023
OpenG143145680 L ST, South BostonSep 7, 2023
OpenG147629841 Cushing AV, DorchesterJun 13, 2023
ClosedPL1409116105 George ST, RoxburyNov 2, 2022
OpenG1407879105 George ST, RoxburyOct 31, 2022

See Other Applicants