SING HO

0%
-48.9 vs 49% median
4
Construction Permits
4
Currently Open
3
Rate-Eligible
permits > 1yr old
2011–2025
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Building3 rated

0.0% closed vs 30% median, 29.9 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2025

Open1
Closed0

Too early to rate — permits need 1 year to mature

2015

0.0%
Open1
Closed0

0 closed / 1 rated

2012

0.0%
Open1
Closed0

0 closed / 1 rated

2011

0.0%
Open1
Closed0

0 closed / 1 rated

All Permits

4 permits
StatusPermit #AddressIssued
OpenALT1612623554-560 Washington ST, DorchesterApr 9, 2025<1yr
OpenALT53871275-87 Harvard AV, AllstonNov 20, 2015
OpenSF13690884 Summer ST, BostonApr 30, 2012
OpenSF108050132-142 Cambridge ST, BostonDec 1, 2011

See Other Applicants